← Client hubR0BATOTen Point Roofing, Content Shoot Plan
R0BATO Media
Roofing Field System · Production Guide · July 2026

Ten Point Roofing
Content Shoot Plan

A field-ready checklist for installations, tear-offs, repairs, verified storm findings, material proof and owner-led trust content. Select the scenario that matches the day and complete the must-get sequence before adding bonus shots.

Primary objectiveTurn each approved roofing project into clear proof of process, workmanship, cleanup and customer communication.
Core shoot2 hours · 1 primary scenario
Output systemSocial · Google · Website · Sales follow-up
How to use this in the field: choose the matching job type, complete every numbered shot, and record the expert-answer block. Safety, property permission and verified technical claims come before content.

Full Shingle Roof Install

New Roof · GAF Shingles · Underlayment · Ventilation · Inspection
⏱ 30–45 min0/12 captured
01
Finished roof, wide street-view shot
Step to the street or sidewalk. Capture the full roofline against the sky. Overcast sky = even, flattering light. This is the hero shot.
PhotoWide
02
Aerial, finished roof from above
Drone shot showing the full roof plane, ridge line, valleys, and shingle pattern. Useful when legally and safely available. Also capture a ground-level hero so the story does not depend on drone access.
Photo + VideoDrone
03
Shingle close-up, texture and color detail
Get tight on a finished section of shingles. Show the approved shingle product texture, shadow lines and color. Confirm the manufacturer and product line before naming them.
PhotoClose-Up
04
Before & After, same angle, same street view
Documented starting condition versus completed roof. Shoot the before on arrival day before any work begins. Match the angle exactly for the after.
PhotoWide
05
Crew nailing shingles, action shot mid-roof
Crew in the middle of the install, shingles going down. Shows the work in progress. Mid-range shot from ground level looking up.
Photo + Video
06
Ridge cap, completed ridge line detail
The ridge cap is the finishing touch. Close or medium shot along the ridge line showing it clean and complete.
PhotoClose-Up
07
Clean jobsite, after crew finishes
Capture the completed cleanup, including the documented nail sweep when used. Avoid claiming the site is clear until the crew has completed its actual final check.
PhotoWide
08
Locked context frame before work changes the scene
Capture one vertical clip and one horizontal still. Hold the frame before and after any movement.
Photo + VideoWideVertical + Horizontal
09
Safe process sequence from wide, medium and close angles
Record the real action without asking anyone to repeat unsafe work or interrupting the crew.
VideoMid + Close8–12 sec
10
Quality-control detail that can be explained accurately
Capture the detail in context and verify the product, method and claim before publishing.
Photo + VideoClose detail
B1
Drone fly-over video, slow pass over finished roof
Slow, smooth drone pass from one end of the roof to the other. 15–20 seconds. Provides an optional establishing clip for short-form edits.
VideoDrone
B2
Magnetic nail sweep, satisfying cleanup clip
Rolling the magnetic sweeper across the lawn/driveway collecting nails. Useful as a short process detail when the sweep is actually part of the job.
Video
Shoot-day plan

Preparation and two-hour run of show

This keeps the crew focused while leaving room for the real project, questions and personality to lead.

Project and outcomeConfirm the real job type, approved scope, customer question and desired next step.
Safety and accessConfirm property permission, crew boundaries, legal drone conditions and where the camera may stand.
Verified claimsApprove certification wording, product names, warranty eligibility, storm findings, offers and service areas.
Publishing pathConfirm town-level location wording, phone/estimate URL, releases and the intended website or social destination.
0:00–0:15
Baseline and permissions
Capture the untouched exterior, verify safety boundaries, releases and the approved project facts.
0:15–0:50
Primary work sequence
Film wide, medium and close coverage from approved ground or safe access points.
0:50–1:15
Owner / expert answers
Record four to six short answers in a quiet, safe location away from active work.
1:15–1:40
Quality, cleanup and people
Capture verified details, crew interaction, protection, cleanup and final inspection.
1:40–1:55
Matched reveal and CTA
Match the opening angle and record the approved next step.
1:55–2:00
Pickup and metadata
Confirm town, service, product, permissions and any claims that still need owner review.
Storm content sequence

Inside → Outside → Documentation → Next steps

Use one real property across four shorts. Open on the visible clue, not a drone shot, and end with “Get the condition documented,” not a coverage promise.

1 · Inside

Ceiling stains and safely accessible interior or attic clues. Explain that where water appears may not be where it entered.

2 · Outside

Homeowner guidance stays at ground level or another safely accessible location: missing or curled shingles, flashing context, gutters and downspouts.

3 · Documentation

Show date, location, close-up, wide context and the written condition finding. Roof and ladder inspection footage is professional-only.

4 · Next steps

Ten Point documents roof condition and explains repair or replacement scope. The insurer decides coverage; Ten Point does not represent the homeowner in the claim.

On-camera system

Topic lobs and starter answers

Send two or three questions before the shoot. Record one clean idea per answer, then use a follow-up example rather than forcing a memorized script.

Topic lob 01

What a roof inspection actually checks

Send this to the client
What do you look for during a roof inspection, and what can a homeowner learn from it?
Natural starter answer
“We start with the condition the customer noticed, then check the roof system, penetrations, flashing, ventilation and any visible interior signs. The goal is to document what is actually there and explain the options clearly.”
Supporting shots
Exterior context, safe ground views, verified condition details, owner explanation
CTA / guardrail
Do not call a condition storm damage or a code issue until it has been verified.
Director follow-up
“Can you give one real example?” Then: “What should someone do next if this applies to them?”
Topic lob 02

Repair or replace?

Send this to the client
What factors help determine whether a roof can be repaired or should be replaced?
Natural starter answer
“Age is only one factor. We also look at the location and extent of the problem, the condition of the surrounding materials, prior repairs and whether a repair can be completed responsibly.”
Supporting shots
Damage context, surrounding roof plane, repair detail, finished result
CTA / guardrail
Do not diagnose or price unseen work; invite an inspection.
Director follow-up
“Can you give one real example?” Then: “What should someone do next if this applies to them?”
Topic lob 03

What happens on installation day

Send this to the client
What should a homeowner expect before, during and after a roof installation?
Natural starter answer
“We confirm access and protection, document the starting condition, complete the work in sequence, keep the property organized and finish with cleanup and a final quality check.”
Supporting shots
Setup, protection, tear-off, layers, crew, cleanup, final inspection
CTA / guardrail
Only state timelines and crew size approved for the specific project.
Director follow-up
“Can you give one real example?” Then: “What should someone do next if this applies to them?”
Topic lob 04

The most common leak areas

Send this to the client
Which roof areas deserve attention when a homeowner notices a leak?
Natural starter answer
“Water can travel, so the visible stain is not always directly below the source. Penetrations, flashing, transitions and damaged materials are common places to inspect, but the actual cause has to be verified on site.”
Supporting shots
Chimney/vent/valley context, verified detail, interior symptom if permitted
CTA / guardrail
Avoid teaching unsafe DIY inspection or telling homeowners to climb onto a roof.
Director follow-up
“Can you give one real example?” Then: “What should someone do next if this applies to them?”
Topic lob 05

Storm-damage first steps

Send this to the client
What should a homeowner do after a storm if they are worried about the roof?
Natural starter answer
“After a storm, work from inside to outside. First, protect the interior and photograph any active water. Next, look only from the ground or another safely accessible place; do not climb onto the roof. Keep the photos, dates and inspection notes together. Then arrange a qualified roof inspection and speak with the insurer about coverage. We document roof condition; we do not decide the claim.”
Supporting shots
Safe exterior, visible verified condition, documentation process
CTA / guardrail
No promises about insurance coverage, claim value or approval.
Director follow-up
“Can you give one real example?” Then: “What should someone do next if this applies to them?”
Topic lob 06

A local project story

Send this to the client
Walk through this approved local project from the customer concern to the finished result.
Natural starter answer
“A useful project story starts with what the homeowner noticed, then shows what the inspection actually found. From there, we explain the work that was approved, document the process, and finish with the completed roof and cleanup. The details change by project, but the sequence should always be honest and easy to verify.”
Supporting shots
Town-safe establishing, before, process, quality detail, matched reveal
CTA / guardrail
Verify town, scope, product, warranty eligibility and customer permission.
Director follow-up
“Can you give one real example?” Then: “What should someone do next if this applies to them?”
Backup topic bank
How ventilation affects the roof system
What homeowners should know before choosing a shingle color
A cleanup and property-protection walkthrough
What certification allows Ten Point to offer, using current official wording
How to prepare for an estimate
A referral partner’s ideal roofing introduction
Post-production map

One shoot, organized for every destination

Capture clean masters first. Platform crops, captions, logos and music are added in post so the same approved project can support social, Google, the website and sales follow-up.

6–10Vertical edits from process, education, reveal and owner answers
1Flagship 45–90 second project film
20–35Edited stills for Google, website and estimates
4+Clean horizontal clips for landing pages
1Verified project brief and permission log

Website and Google handoff

Record the project type, approved town, customer concern, verified scope, product, result and estimate path.

  • Keep raw masters clean and unwatermarked.
  • Label drone footage separately with flight and permission notes.
  • Provide matched before/process/after selects and transcript excerpts.
  • Let the website partner choose target URLs, schema and indexing treatment.

Publishing approval

Confirm every statement that could affect safety, warranty, insurance, certification, pricing or expected performance.

  • Use the official GAF designation exactly as currently authorized.
  • Do not promise insurance coverage, claim approval, fixed timelines or unseen pricing.
  • Use neutral review invitations and genuine customer permission.
  • Track qualified inspections, estimates and booked work, not reach alone.

Ready for the next roofing shoot

Open the matching scenario, work the checklist from top to bottom, then record the owner explanation and verified estimate action.