← Client hubR0BATOShot Sheet, 2142 PA-212 Coopersburg Build
R0BATO Media
Shot Sheet · Coopersburg Recreation Building · 2142 PA-212 · Phases 2–5

Coopersburg build
Phases 2–5

The baseline is shot and the positions are logged. Every visit from here is the same shape: pull the log, repeat the frames, then shoot what is happening. Anchors first, every time, before the site gets busy.

Site2142 PA-212
Coopersburg, PA 18036

Private property, owner consent required before anything publishes
What it isAll-steel recreation building, indoor pickleball court, lounge, interior TBC. Uncle Josh's Buildings LLC.
BaselineComplete, ground, first break, all fixed positions logged. Phases 2–5 remain.
Every visit: tab 1 first, then whichever phase you are on. The anchors take ten minutes and they are the reason the sequence works. Two things here cannot be recovered if missed, the tendon grid (pour morning, before concrete) and the stressing (days later, sub-hour window, short notice). Tab 6 is entirely optional, the build carries the story without anyone on camera. Scope, phases and what gets delivered live on the project page.

1 · Anchors

every visit, before anything else
⏱ 15–20 min0/5 captured
01
Ground A, the front elevation mark
Pull the anchor log first. Same spot, same height, same lens as the baseline. If the mark is gone, use the reference photo and the fixed landmark to re-find it before shooting anything else.
CorePhotoFirst
02
Ground B, C, D, the other three marks
Same discipline. Four positions, full rotation. Ten minutes, and they are the entire reason the sequence works.
CorePhotoFirst
03
Drone hero, re-fly the logged coordinates
Lat/lon, altitude AGL, heading, gimbal pitch, straight off the log. Not close. The same.
CoreVideoLog
04
Drone nadir, same altitude as baseline
Gimbal -90 degrees, centered on the footprint. Altitude has to match or the comparison breaks.
CoreVideoNadir
05
Update the log with anything that moved
If a mark got destroyed and you re-established it, write down where the new one is.
Admin
Milestone capture plan

One build, six inspectable decisions

Capture the same camera position at every milestone and connect the finished building to the use established at the start.

1 · Intended use

What the building needs to support and why clear span, circulation or storage matters for this owner.

2 · Site constraints

Document slope, rock, drainage and access as observed project inputs, not engineering conclusions.

3 · Size and openings

Show how footprint, door locations and openings connect to the intended use.

4 · Quote boundaries

State what this project’s number includes and excludes before anyone signs. Avoid vague starting-price content.

5 · Frame-up and craft

Use the locked angle plus one verified construction detail that can be explained accurately.

6 · Finished use

Return to the original need and show how the completed building supports it.

Fill this in on site

The anchor log

Filled it on your phone and want it on the laptop? Hit Copy sync link and open that link on the other device, the whole log rides in the URL, so it lands wherever you paste it. Keep editing after — it saves as you type, and a fresh Copy sync link makes a new one. Old links know they are old and will ask before overwriting anything newer. Type into it on your phone while you are standing on the marks, it saves as you go and it is still here on the next visit. An anchor is a camera position you can return to exactly; log it now and every later visit is a repeat instead of a guess. A before-and-after is only as good as its worst match, and this is the one thing on this page that is genuinely unrecoverable later.

Visit

Ground A, future front elevation

Core

Ground B

Core

Ground C

Core

Ground D

Core

Drone, hero

Core

Drone, nadir

Core

Drone, orbit

Core

Next windows

Tomorrow

Run of show

Built backward from golden hour. An open lot with no shade has no shape at midday. Morning equivalent is ~5:45–7:00 AM, though if a crew is working the site, daytime gets you machines and people that an empty evening lot will not.

First 10 min
1 · Anchors, pull the log, repeat the frames
Four ground marks, drone hero, drone nadir. Same spot, same height, same altitude. Before anything else.
Then
The phase you are on
Foundation, stressing, steel, or finished. Whatever the site is doing that day.
Throughout
Scale reference in every depth shot
Tape, boot, person. Depth means nothing without something a viewer knows the size of.
Before leaving
Update the log · get the next date
Anything that moved gets written down. Confirm the next window with James before you drive off.
After tonight

The three windows that do not wait

Not a plan, just the dates that punish you for missing them. Everything else on this build can be picked up on a later visit.

Pour day
The tendon grid, before concrete
The grid is what makes this a post-tension pad and it is buried the moment the pour starts. Shoot it on arrival, everything else that day can be picked up, that cannot.
+3–10 days
Stressing the tendons
Tendons are stressed once the concrete hits ~2000 psi, typically 3–10 days after the pour, sometimes an initial stress at 48–72 hrs. Hydraulic jack, cable under load, tails cut off. Sub-hour window, no reschedule, and almost nobody has this footage. Ask him to text you when the crew is booked.
+1–2 weeks
Structure goes up
Repeat the anchors first, same positions as tonight.
Finished
The after
Re-shoot the log exactly, and match the light too. A golden-hour after against a midday before reads as two different projects.

Read the ground, set the anchors, log them

Whatever state you find is the baseline. The four ground positions and the log are the whole job, the drone is probably in scope, and the rest is a conversation, not an assumption.